Place of Origin: | China |
Brand Name: | NOVA |
Certification: | ISO9001; ISO14001; CE |
Model Number: | NH |
Minimum Order Quantity: | Negotiable |
---|---|
Price: | Negotiable |
Packaging Details: | Standard export package |
Delivery Time: | 15-20 working days |
Supply Ability: | 8000TONS/Month |
Feature: | Corrosion Protection | Loading Capacity: | 1 Ton ~ 5 Ton/layer |
---|---|---|---|
Certificate CE, ISO, SGS, TUV, SS4080: | CE, ISO, SGS, TUV, SS4080 | Surface Treatment: | Powder Coating |
Raw Material: | Q235B | Application: | OEM |
High Light: | drive in racking system,drive through racks |
1. One of the most economical, High Density, storage systems available today.
2. Best suited for use on large quantities of "Like Items".
3. Uses a "Last In - First Out" method of recovery, and thus is much better suited to items with a long shelf life.
4. Uses a "Common entrance and exit", so access need only be from one side.
5. Uses "Separate entrances and exits" so access needs to be on both sides.
6. The forklift drives directly into the rack for storage or recovery, allowing storage of 2 or more pallets deep.
7. Used for High-Density Storage.
Raw Material | Q235B steel |
Surface | Powder coating or galvanized |
Delivery time | Within 20 days after receiving 30% deposit |
Payment term | 30% T/T in advance and 70% against fax/scan copy of BL or LC at sight |
Warranty | 10 years warranty from the date of delivery to the carrier. |
HS CODE | 73089000 |
Notes | Various sizes ,loading capacity and colors are available . |
Packing Details : Packed by wooden bars, crates, metal stripes, films for bulk goods, and cartons for accessories. Package is also customized. A 40'GP is available for around 20-25 tons materials and accounts for up to 55 CMB
Delivery Details : Within 20 days after payment
Radio Shuttle shuttle Racking system consists of supporting rack, shuttle rails and a Radio shuttle cart (Also Called Pallet Runner or Pallet Mole). The Radio shuttle cart runs on the rails and is propelled by an electric motor. It also has a platform on the top that can lift up and down. The lifting action is required to lift a pallet that is placed on the rail and then the electric motor moves the cart with the pallet on top into the rack in order to deposit the pallet in its right position.
FAQ:
Contact Person: Mr. Jerry
Tel: 13705159108
Fax: 86-25-51873970
Address: 9th floor, Building 1, Zijinxivheng Center, No.118, Olympic St, Nanjing
Factory Address:No.8 Boqiao St, Bingjiang Development Zone, Jiangning, Nanjing